72372 - Taxiway Echo Demolition & Site Restoration
The project consists of the removal of an existing asphalt taxiway and restoration of the area to turf. The scope encompasses demolition of approximately 6,000 SY of asphalt pavement and underlaying section to dirt, removal of taxiway edge lights and signs, erosion control, earthwork, and turf stabilization with topsoil and sod and other related work as shown on the drawings and/or in the specifications.
Addenda
(click to expand/collapse)
Name | Size | |||
Addendum No. 1 - 72372 | 1.4 MB | |||
Addendum No. 2 - 72372 | 680.6 KB | |||
Addendum No. 3 - 72372 | 1.3 MB |