Ida B. Wells Plaza Site Improvements
Demolition of paving/plaza (concrete & brick pavers), partial retaining wall removal, concrete removal within raised planter, tree removal, clearing & grubbing for the installation of a playground within an existing park (Pine Hill Park) that includes: tree removal, pedestrian light standards, and miscellaneous items. Project will require the contractor to remove/salvage and reinstall the Ida B. Wells Statue, Lynching Tree Artwork & Plaque. There will be new construction which includes: site grading, installation of a new segment of brick retaining/raised planter wall, raised planter subsurface drainage, concrete & color concrete paving, installation of brick pavers, pedestrian concrete seating, wayside exhibit bases and owner furnished signage, statue base & foundations and reinstallation of the bronze Ida B. Wells Statue. The project will also include landscaping, irrigation system, speciality site lighting, new signage, erosion control measures, tree protection fencing, construction and subsurface piping and sleeving. All demolition debris will be removed from the site and disposed of in a legal manner. A 100% stand of grass will be required prior to project completion being obtained. There are two bid alternates for this project.
Addenda
(click to expand/collapse)

The Consultant will forward one (1) copy of all addenda to holders of each set of documents. All such addenda will become a part of the contract documents and subject to all conditions contained therein, and must be listed on the Bid Form for the bid to be accepted. Note: no addendum shall be issued within seven (7) calendar days prior to the date set for opening of bids, unless said addendum, delays the opening of said bids.