Southwind HS Track Replacement

Repair and replacement of the existing track surface. Specifics to the project include asphalt track base, track surface and track / field drainage improvements or modifications. The scope also includes any associated demolition, site work, excavation or concrete repairs / replacement. Any damages to the existing project site shall be repaired and restored to the original condition or better.
No files available