Airfield Sign Replacement at the McKellar-Sipes Regional Airport

Remove existing signs and concrete bases; Install new L-858 LED signs on new concrete bases.
Addenda (click to expand/collapse)
Every request for such interpretation should be in writing addressed to the ENGINEER and to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Specifications which, if issued, will be mailed by certified mail with return receipt to all prospective Bidders (at the respective addresses furnished for such purposes), not later than three (3) days prior to the date fixed for the opening of bids. Failure of
any Bidder to receive any such addendum or interpretation shall not relieve such Bidder from any obligation under his bid as submitted. All addenda so issued shall become part of the Contract Documents.
Download section as a Zip file free of charge
Name Size
Addendum No. 1 2.3 MB
Addendum No. 2 12.4 KB