TC2023-30 Lateral K Bank Stabilization
This project consists of clearing and stabilizing of a section of ditch bank by the installation of concrete flexamat, grading and sodding and other items of work as called for in the contract documents as required for a completed project. Two 8-foot x 8-foot gates will be required to be installed along the north fence line of the bus parking area to access the construction site. A chain and lock, with two (2) additional keys, will be required. The gate will remain in place after construction is complete. Exact location of gate to be field identified.
Status
Bidding Closed
Bid Date | 6/14/23 2:00pm |
Company & Contacts
Town of Collierville
Terri Spears
901-457-2253
Location
Collierville, TN