James Avenue Road Improvements
Project consists of the installation of new sidewalks, curb and gutter, drainage improvements, striping, signage, crosswalks, curb ramps, and roadway repair. The Project Length Is 0.13 Miles.
Addenda
(click to expand/collapse)

Name | Size | |||
18280-Addendum No. 1 | 708.7 KB | |||
18280-Addendum No. 2 | 113.2 KB | |||
18280-Addendum No. 3 | 334.7 KB | |||
18280-Addendum No. 4 | 4.1 MB |