This project consists of traffic control, tree removal, erosion control, saw cutting of concrete, removal of and replacement of concrete driveway and driveway aprons, excavation of material, demolition of existing concrete swale, installation of new drainage pipe and inlets, adjustment of water and sewer mains if required, curb and gutter installation, asphalt patching, and other items of work as called for in the contract documents for a completed project.