061371 I-57/HWY. 5 INTCHNG. IMPVTS. (CABOT) (F)

This project consists of clearing and grubbing, removal and disposal items, flowable select material, stone backfill, earthwork, select granular backfill,trenching and shoulder preparation, aggregate base course, cement stabilized crushed stone base course, portland cement concrete base, achm base, binder, and surface courses, cold milling asphalt pavement, achm patching of existing roadway, portland cement concrete pavement, approach slabs, portland cement concrete driveway, maintenance of traffic, concrete ditch paving, minor drainage, guardrail, erosion control, concrete island, concrete walks, curb, and gutter, wheelchair ramps, traffic signal items, signing items, lighting items, pavement marking, construct one prestressed concrete girder unit (total length 182.22'), and misc. items.

Status

Accepting Bids

Bid Date 1/21/26 10:00am

Company & Contacts

ARDOT
Program Management Division  
(501) 569-2261

Location

Lonoke, AR

Bid Information:

Internet bids for the construction of the following jobs will be received by the Arkansas Department of Transportation at the STATE HIGHWAY BUILDING located at 10324 INTERSTATE 30, southwest of LITTLE ROCK, ARKANSAS, until ten o'clock a.m., (10:00 a.m.), January 21, 2026. Bids will be posted on the Department’s website at http://www.ardot.gov/divisions/program-management/construction-contractdevelopment/ construction-contractors/currently-advertised-projects once the downloading process has been completed.


Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission.