City of Tutwiler Project - Blues Park Walking Trail Phase 1A Package
Project consists of the following scope of work: demolition of the existing site elements (with the exception of areas/elements not within the construction limits or items not labeled for removal on the Demolition Plan) such as, but not limited to: foundations, utilities, concrete paving, fencing, gravel areas, trees, signage, and other elements as noted, construction of one construction entryway which access Holly Street, as well as the construction of a concrete walking trail which includes color concrete paving in key areas, trail markings within the trail surface, site grading, irrigation sleeving, and erosion control measures. There are also seven Add Alternates for this project.
Plan Holders
Date | Company | Contact |
5/31/23 3:26 pm |
Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 |
Jemar Sagbigsal
Tel: 3236025079
|
5/23/23 1:55 pm |
Hemphill Construction Company
P. O. Box 879 Florence, MS 39073 |
Beth Harrison
Office Manager
Tel: 601-326-9112
Fax: 601-932-2550
|
6/15/23 2:50 pm |
jhayden
123 street peabody, MA 01960 |
jake hayden
Tel: 6038542054
|