Terrell Heights Storm Sewer Improvements Phase 1 And Phase 2

The project consists of the removal and replacement of stormwater lines, cured in place lining of existing stormwater lines, the installation of stormwater detention improvements, the relocation of a water main within the project area, the installation of a gravity sewer doghouse manhole and sewer line within the project area, and all associated appurtenances and restoration.
Phase I - Bid Documents (click to expand/collapse)
Please note Barge Design Solutions is utilizing a new plan room solution. To access documents, you will need to register for a new account with this platform, even if you had a username with the previous system. For questions about accessing the documents please contact plan room support at 901-381-9811.
Name Size
001 G0.00 2.1 MB
002 G0.01 3.2 MB
003 G0.02 5.0 MB
004 C1.01 1.2 MB
005 C1.02 1.5 MB
006 C1.03 2.0 MB
007 C2.01 6.4 MB
008 C5.01 1.9 MB
009 C5.02 2.1 MB
010 C5.03 2.7 MB
011 C5.04 2.8 MB
012 C5.05 2.0 MB
013 EC0.01 2.3 MB
014 EC1.01 1.2 MB
015 EC1.02 1.4 MB
016 EC5.01 2.2 MB
017 EC5.02 1.8 MB
Phase II - Bid Documents (click to expand/collapse)
Please note Barge Design Solutions is utilizing a new plan room solution. To access documents, you will need to register for a new account with this platform, even if you had a username with the previous system. For questions about accessing the documents please contact plan room support at 901-381-9811.
Name Size
001 G0.00 2.2 MB
002 G0.01 218.7 KB
003 G0.02 524.8 KB
004 C1.01 575.8 KB
005 C1.02 438.4 KB
006 C1.03 416.4 KB
007 C1.04 423.6 KB
008 C5.01 395.9 KB
009 C5.02 2.0 MB
010 C5.03 2.4 MB
011 C5.04 3.3 MB
012 C5.05 3.7 MB
013 C5.06 1.6 MB
014 EC0.01 877.8 KB
015 EC1.01 719.2 KB
016 EC1.02 656.8 KB
017 EC5.01 766.8 KB
018 EC5.02 659.5 KB
019 EC5.03 311.7 KB