TC2024-28 PRC Washington St. Improvements
This project consists of erosion control, traffic control, demolition of curb & gutter, demolition of sidewalk, removal of asphalt, installation of curb & gutter, installation of sidewalk, installation of concrete parking area, installation of water main & service, installation of brick crosswalks, installation of asphalt, excavation of material, demolition of existing drainage pipes, installation of new drainage pipe and inlets, asphalt patching, and other items of work as called for in the contract documents for a completed project.
Addenda
(click to expand/collapse)

Name | Size | |||
TC2024-28 Addendum 1 REVISED | 220.1 KB | |||
TC2024-28 Addendum 2 | 73.8 KB | |||
TC2024-28 Addendum 3 | 2.5 MB | |||
TC2024-28 Addendum 4 | 557.6 KB | |||
TC2024-28 Addendum 5 | 76.0 KB |