TC2024-19 Shelton Road Wastewater Treatment Plant Oxidation Ditch Rotor Replacement
This project consists of supplying all materials and labor for the direct replacement, to include installation and leveling, of two oxidation ditch rotors at the Shelton Road Wastewater Treatment Plant.
Addenda
(click to expand/collapse)

Name | Size | |||
Addendum No 1 TC2024-19 Shelton Rd Oxidation Ditch Rotor Replacement | 95.8 KB | |||
TC2024-19 Addendum 2 | 127.1 KB |