First Utility District – Water Treatment Plant Pre-Sedimentation Basin No. One Rehabilitation

Demolition of spalling concrete, epoxy coating of the concrete, removal of reinforcing corrosion, and placing of repair material for Pre-Sedimentation Basin No. One at the water treatment plant.
Addenda (click to expand/collapse)
Name Size
Addendum No. 1 - 23451.01 1.9 MB