Bolivar Sewer System Rehabilitation Phase I (old bid)

Project includes rehabilitation of the existing sewer collection system. Rehabilitation methods include cured in place pipe, point repairs, and linear repairs. The project also replaces an existing 4″ force main along South Polk Street.
Addenda (click to expand/collapse)