Fuller Lane Improvements - Phase 2

The project consists of the widening of Fuller Lane from a point approximately 2624 feet west of Gum Springs Road (Hwy. 267) on Fuller Lane to Hwy. 267. The project will be constructed in a variable width right of way, permanent drainage easements, and temporary construction easements and is 2624 feet in length. The improvements consist primarily of reconstructing and widening the existing section including, but not limited to grading, crushed stone base course, ACHM paving, curb & gutter, drainage structures and associated piping, sidewalk, and other miscellaneous items.
Date Company Contact
1750696417
6/23/25 4:33 pm
Capital Paving & Construction LLC. 1668 Letona Road
SEARCY, AR 72143
Brad Davis
Tel: 5012780522
1751034580
6/27/25 2:29 pm
Constructconnect 30 Technology Parkway South Suite 100
Norcross, GA 30092
Jemar Sagbigsal
Tel: 3236025079
1750931194
6/26/25 9:46 am
Redstone Construction Group, Inc. 505 West Dixon Road
Little Rock, AR 72206
Jeremy Moore
PMA Manager
Tel: 501-374-1557
Fax: 501-374-8314
1751016289
6/27/25 9:24 am
White River Materials, Inc. PO Box 2501
Batesville, AR 72503
David Shetron
Tel: 8707935773