TC2025-39 Nonconnah Pump Station Improvements
The PROJECT shall consist of, but is not limited to, Removal and replacement of an existing Link-Seal around the existing station discharge pipe. Installation of an Owner supplied dry pit submersible solids handling sewer pump. Valves, fittings, anchors, and braces required to install the new pump. Modification of existing steps to facilitate installation of the new pump. Electrical and controls work required to furnish and install four (4) new variable frequency drives (VFDs) to feed the three (3) existing pumps and the newly installed fourth pump. Demolition, relocation of existing VFD’s and other electrical items. Painting of various items within the station required as part of the work. Cleanup, disposal of debris, and all other items required to form a complete, functional system.
Bid Documents
(click to expand/collapse)

VIEWING ONLY – NOT FOR DISTRIBUTION
DISTRIBUTION IS AVAILABLE ONLY
FROM THE TOWN OF COLLIERVILLE PROCUREMENT DIVISION
tocpurchasing@colliervilletn.gov
DISTRIBUTION IS AVAILABLE ONLY
FROM THE TOWN OF COLLIERVILLE PROCUREMENT DIVISION
tocpurchasing@colliervilletn.gov
Name | Size | ||
BID ENVELOPE FRONT-CONST | 12.3 KB | ||
TC2025-39 Notice of Formal Release | 220.2 KB | ||
TC2025-39 PRC Nonconnah Pump Station | 8.2 MB |