City of Bolivar - Sewer Lagoon Upgrades – New Aeration System

The Project includes demolition of existing surface aerators and installing new surface aerators in two lagoons and new floating wetlands in one lagoon.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 1 1.5 MB
Addendum 2 103.2 KB