TC2026-02 Culvert Replacement (Hwy 72 at Sycamore)

This project consists of removing an existing pecan tree, approximately 24 LF of 48” RCP, two 24” CMP pipes at approximately 24 LF each and installing 40 LF of 54” RCP with flared end sections.
Bid Documents (click to expand/collapse)
VIEWING ONLY – NOT FOR DISTRIBUTION
DISTRIBUTION IS AVAILABLE ONLY
FROM THE TOWN OF COLLIERVILLE PROCUREMENT DIVISION
tocpurchasing@colliervilletn.gov
Name Size
BID ENVELOPE FRONT-CONST 57.2 KB
TC2026-02 Bid Distribution Form 249.0 KB
TC2026-02 Notice of Formal Release 219.6 KB
TC2026-02 PRC Invitation to Bid 5.7 MB