ITB - Junction & Clinton Bridge Relighting
Provide conduit, wire and field connections for all equipment, HVAC systems, panelboards, transformers, and electrical equipment furnished under Divisions 1, 11, 21, 22, 23, and 26.
Bid Documents
(click to expand/collapse)

Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission.
Name | Size | ||
001 G0.0 | 452.8 KB | ||
002 A1.1 | 2.2 MB | ||
003 A1.2 | 1.7 MB | ||
004 A1.3 | 2.1 MB | ||
005 A1.4 | 2.0 MB | ||
006 A1.5 | 1.6 MB | ||
007 E1.1 | 521.8 KB | ||
008 E1.2 | 896.2 KB | ||
009 E1.3 | 762.4 KB | ||
010 E1.4 | 541.5 KB | ||
011 E1.5 | 684.4 KB | ||
012 C1.1 | 194.1 KB | ||
013 C1.2 | 392.9 KB | ||
014 A2.1 | 4.3 MB | ||
015 A2.2 | 3.0 MB | ||
016 A2.3 | 1.8 MB | ||
017 A2.4 | 4.3 MB | ||
018 E2.1 | 524.4 KB | ||
019 E2.2 | 1.4 MB | ||
020 E2.3 | 1.2 MB | ||
021 E2.4 | 1.6 MB | ||
022 E2.5 | 641.4 KB | ||
023 E2.6 | 451.1 KB | ||
024 C2.1 | 195.8 KB | ||
025 C2.2 | 560.8 KB | ||
026 C2.3 | 290.8 KB |