Replace HVAC Gentry Residential Treatment Center Cabool

The project includes replacing the existing split systems with new split systems in addition to the installation of new Dedicated Outside Air units (DOAS) to provide ventilation air and manage building pressurization.
Bid Documents (click to expand/collapse)
Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission.
Name Size
001 COVER 263.7 KB
002 G-101 3.3 MB
003 MEP-101 409.6 KB
004 M-001 433.9 KB
005 M-101 468.8 KB
006 M-102 419.6 KB
007 M-201 380.3 KB
008 M-202 476.1 KB
009 M-301 377.4 KB
010 E-001 397.7 KB
011 E-101 421.4 KB
012 E-201 386.9 KB