Echelon/Lockwood Glen Site Infrastructure Project Completion - Grading Contractor Services

The work required for Lockwood subdivision will be regrading existing of erosion, stabilizing, and removing old erosion control measures. The work required at Echelon subdivision will be removing woody debris from an outfall structure and removing old erosion control measures.
Bid Documents (click to expand/collapse)
Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission.
Name Size
001 C-3.1 16.9 MB
002 C-4.00 16.9 MB
003 NONE 1.4 MB
004 C3.1 9.0 MB