Downstream Gas South Sewer Replacement
The installation of approximately 5,000 LF of ductile iron gravity sewer main from immediately downstream of the Gas South Arena to just south of SR-120, running approximately parallel to Fork Creek and the existing 18” to 24” VCP Fork Creek sewer interceptor. Approximately 500 LF of the proposed sewer is 8" pipe and 4,500 LF is 30" pipe. Two (2) public right-of-way crossings will be performed by 48” trench less installation. A total of seven (7) connections to branch sewer lines will be required. The project also includes restoration of the project corridor, traffic control, erosion and sedimentation control, and abandonment of sanitary sewer mains and appurtenances throughout the project limits.
Addenda
(click to expand/collapse)
