Downstream Gas South Sewer Replacement

The installation of approximately 5,000 LF of ductile iron gravity sewer main from immediately downstream of the Gas South Arena to just south of SR-120, running approximately parallel to Fork Creek and the existing 18” to 24” VCP Fork Creek sewer interceptor. Approximately 500 LF of the proposed sewer is 8" pipe and 4,500 LF is 30" pipe. Two (2) public right-of-way crossings will be performed by 48” trench less installation. A total of seven (7) connections to branch sewer lines will be required. The project also includes restoration of the project corridor, traffic control, erosion and sedimentation control, and abandonment of sanitary sewer mains and appurtenances throughout the project limits.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications will be available for purchase at contractor’s expense, which will be fulfilled by the Barge Design Solutions, Inc.’s Planroom (https://bidding.bargedesign.com/) To purchase a hard copy set or download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. For questions about accessing the documents please contact Memphis Reprographics at 901-381-9811. Call prior to picking up documents to ensure availability. Partial sets of the Bidding Documents will not be available directly from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of bidding documents including addenda, if any are obtained from sources other than the Issuing Office. No part of the purchase will be refunded.
Name Size
BL126-25_Volume 1 2.0 MB
BL126-25_Volume 2 3.6 MB
BL126-25_Volume 3 37.8 MB