PROJECT NO. ST03031/ST03245 Drainage Improvement Group 2

Installation of new drainage system, including 723 lf on 24”-30” round drainage pipe and 45”x29” horizontal elliptical drainage pipe and associated drainage structures (manholes, headwalls, and inlets) at two projects locations.
Bid Documents (click to expand/collapse)
Name Size
Project Specifications 8.8 MB