CDBG Community Outreach Building Project (FY2026-189)
The general scope of work is to supply all fees, labor, materials, and equipment to prepare the immediate site, construct pavements, utilities, construct foundations, super-structure, metal siding and roofing, insulate the building, provide motor-operated insulated sectional garage doors, provide gas heat and ventilation, electrical power and lighting and a wet fire sprinkler system and obtain a Certificate of Occupancy.
Bid Documents
(click to expand/collapse)
(click to expand/collapse)
Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission.
| Name | Size | ||
| 001 CV & LS-101 | 304.6 KB | ||
| 002 C-1 | 638.8 KB | ||
| 003 C-2 | 683.7 KB | ||
| 004 A-101 | 286.8 KB | ||
| 005 A-201 | 172.9 KB | ||
| 006 S-101 | 342.0 KB | ||
| 007 M101 | 578.3 KB | ||
| 008 M001 | 550.7 KB | ||
| 009 M002 | 610.1 KB | ||
| 010 P101 | 491.3 KB | ||
| 011 P001 | 472.9 KB | ||
| 012 P002 | 488.1 KB | ||
| 013 FP101 | 476.2 KB | ||
| 014 FP001 | 479.2 KB | ||
| 015 E101 | 344.0 KB | ||
| 016 E001 | 330.6 KB | ||
| 017 E002 | 324.1 KB | ||
| 018 E003 | 2.2 MB |
