City of Memphis - Maxson Wastewater Treatment Plant Primary Sludge Line Replacement

The MAXSON WASTEWATER TREATMENT PLANT – PRIMARY SLUDGE LINE REPLACEMENT project (SW20203) consists of installation of a new primary sludge line for the Maxson Wastewater Treatment Plant located at 2685 Steam Plant Road. The Work generally consists of the installation of a 16” DR11 DIPS HDPE pipe from the primary sludge pump building at the treatment plant to the sludge lagoons located near Riverport Road and Buoy Street, a distance of approximately 6,300 L.F.; installation of 230 L.F. of 22” steel casing by dry jack and bore under Riverport Road; installation of 70 L.F. of 22” steel casing by dry jack and bore under Plant Road; installation of air release valves; and all other appurtenant and necessary work required to complete the project as shown on the plans and described in the specifications. Connections of the new force main and abandonment of the old force main shall be done with minimal down time for the primary sludge system. Timing and duration of this work shall be established by the City of Memphis.

Status

Bidding Closed

Bid Date 12/9/20 12:00pm

Company & Contacts

Power Hill Design, LLC
Steve Hill  
901-543-8000 ext. 2

Location

2685 Steam Plant Road, Memphis, TN 38109

Bid Inforamtion

Sealed bids will be received at the Office of the City of Memphis Purchasing Agent, Room 354, City Hall, 125 N. Main, Memphis, TN 38103, until 12:00 Noon, December 9, 2020.

For the mutual protection of the City and all subcontractors and material suppliers, partial sets of documents will not be issued. Therefore, all contractors intending to submit a bid shall obtain one (1) complete set of documents from the City in order for his bid to be accepted. This will also place the Contractor on the mailing list for possible addenda issuance.

Bidding documents are available at the office of:

Powers Hill Design, LLC
Attn: Steve Hill, P.E.
80 Monroe Avenue, Suite 420 Memphis, TN 38103
(901) 54 3-80 ext. 2
Email: shill@phdmemphis.com

The non-refundable cost of bidding documents is $100.00 per set.

Scope of Work

The MAXSON WASTEWATER TREATMENT PLANTPRIMARY SLUDGE LINE REPLACEMENT project (SW20203) consists of installation of a new primary sludge line for the Maxson Wastewater Treatment Plant located at 2685 Steam Plant Road. The Work generally consists of the installation of a 16” DR11 DIPS HDPE pipe from the primary sludge pump building at the treatment plant to the sludge lagoons located near Riverport Road and Buoy Street, a distance of approximately 6,300 L.F.; installation of 230 L.F. of 22” steel casing by dry jack and bore under Riverport Road; installation of 70 L.F. of 22” steel casing by dry jack and bore under Plant Road; installation of air release valves; and all other appurtenant and necessary work required to complete the project as shown on the plans and described in the specifications. Connections of the new force main and abandonment of the old force main shall be done with minimal down time for the primary sludge system. Timing and duration of this work shall be established by the City of Memphis.

Hard copy full sets of plans and specifications will be available for purchase at contractors expense, which will be fulfilled by Memphis Reprographics or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.