City of Memphis - Maxson Wastewater Treatment Plant Primary Sludge Line Replacement

The MAXSON WASTEWATER TREATMENT PLANT – PRIMARY SLUDGE LINE REPLACEMENT project (SW20203) consists of installation of a new primary sludge line for the Maxson Wastewater Treatment Plant located at 2685 Steam Plant Road. The Work generally consists of the installation of a 16” DR11 DIPS HDPE pipe from the primary sludge pump building at the treatment plant to the sludge lagoons located near Riverport Road and Buoy Street, a distance of approximately 6,300 L.F.; installation of 230 L.F. of 22” steel casing by dry jack and bore under Riverport Road; installation of 70 L.F. of 22” steel casing by dry jack and bore under Plant Road; installation of air release valves; and all other appurtenant and necessary work required to complete the project as shown on the plans and described in the specifications. Connections of the new force main and abandonment of the old force main shall be done with minimal down time for the primary sludge system. Timing and duration of this work shall be established by the City of Memphis.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications will be available for purchase at contractors expense, which will be fulfilled by Memphis Reprographics or files may be downloaded for free from our online plan room. To download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.
Name Size
001 COVER 342.5 KB
002 C00.01 4.0 MB
003 C01.01 2.6 MB
004 C01.02 3.3 MB
005 C01.03 3.3 MB
006 C01.04 2.9 MB
007 C01.05 3.4 MB
008 C01.06 3.5 MB
009 C02.01 2.7 MB
010 C02.02 2.9 MB