Sanitary Sewer System Rehabilitation Program Fiscal Year 2023-2025

The Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the Cured-In-Place Pipe method and manhole rehabilitation. There is approximately 11,170 linear feet of 8-inch and 10-inch sewer lines that need to be lined using the Cured-In-Place Pipe method, and approximately 308 VF of manhole that needs Level C manhole rehabilitation.
Addenda (click to expand/collapse)
All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed, delivered or otherwise issued to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Oral and other interpretations or clarifications will be without legal effect.
Download section as a Zip file free of charge
Name Size
Addendum No. 1 151.3 KB
Addendum No. 2 373.0 KB
Addendum No. 3 98.7 KB