Sanitary Sewer System Rehabilitation Program Fiscal Year 2023-2025
The Project consists of furnishing all labor and materials necessary for cleaning, videoing, and lining sanitary sewers using the Cured-In-Place Pipe method and manhole rehabilitation. There is approximately 11,170 linear feet of 8-inch and 10-inch sewer lines that need to be lined using the Cured-In-Place Pipe method, and approximately 308 VF of manhole that needs Level C manhole rehabilitation.
Bid Documents
(click to expand/collapse)

Please note Barge Design Solutions is utilizing a new plan room solution. To access documents, you will need to register for a new account with this platform, even if you had a username with the previous system. For questions about accessing the documents please contact plan room support at 901-381-9811.
Name | Size | ||
001 COVER | 349.5 KB | ||
002 C-001 | 1.7 MB | ||
003 C-002 | 2.4 MB | ||
004 C-003 | 2.5 MB | ||
005 CU101 | 2.6 MB | ||
006 CU102 | 2.7 MB | ||
007 CU103 | 2.8 MB | ||
008 CU104 | 2.5 MB | ||
009 CU105 | 2.9 MB | ||
010 CU106 | 2.7 MB | ||
011 CU107 | 2.7 MB |