City of Franklin - Phase 1 – 2023 Sewer Rehabilitation Project
The project consists of approximately 1,700 feet of cured in place pipe sewer rehabilitation, of which approximately 1,050 feet is 8-inch and 650 feet; replacin approximately 10,000 feet of existing 6-inch to 12-inch sewer by pip bursting means; rehabilitation of approximately 500 vertical feet of manholes; and reinstatement of service laterals with approximately 50 by robotic means and 160 by open cut means.
Addenda
(click to expand/collapse)

Name | Size | |||
Addendum No. 01 | 253.6 KB | |||
Addendum No. 02 | 177.0 KB |