Fuller Lane Improvements - Phase I
The project consists of the widening of Fuller Lane from approximately 3662 feet west of Gum Springs Road (Hwy. 267) to 1562 feet east on Fuller Lane. The project will be constructed in a variable width right of way, permanent drainage easements, and temporary construction easements and is 1038 feet in length. The improvements consist primarily of reconstructing and widening the existing section including, but not limited to grading, crushed stone base course, ACHM paving, curb & gutter, drainage structures and associated piping, sidewalk, and other miscellaneous items.
Addenda
(click to expand/collapse)
