Fuller Lane Improvements - Phase I
The project consists of the widening of Fuller Lane from approximately 3662 feet west of Gum Springs Road (Hwy. 267) to 1562 feet east on Fuller Lane. The project will be constructed in a variable width right of way, permanent drainage easements, and temporary construction easements and is 1038 feet in length. The improvements consist primarily of reconstructing and widening the existing section including, but not limited to grading, crushed stone base course, ACHM paving, curb & gutter, drainage structures and associated piping, sidewalk, and other miscellaneous items.
Plan Holders
Date | Company | Contact |
6/23/25 4:33 pm |
Capital Paving & Construction LLC.
1668 Letona Road SEARCY, AR 72143 |
Brad Davis
Tel: 5012780522
|
6/27/25 2:27 pm |
Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 |
Jemar Sagbigsal
Tel: 3236025079
|
6/23/25 3:24 pm |
H.W. Tucker Co
PO Box 309 North Little Rock, AR 72115 |
Laci Bradley
Tel: 5013749269
|
6/26/25 9:45 am |
Redstone Construction Group, Inc.
505 West Dixon Road Little Rock, AR 72206 |
Jeremy Moore
PMA Manager
Tel: 501-374-1557
Fax: 501-374-8314
|
6/27/25 9:23 am |
White River Materials, Inc.
PO Box 2501 Batesville, AR 72503 |
David Shetron
Tel: 8707935773
|