TC2025-40 Eastbrook Trail Improvements
1. Project Description This project consists of repairing, patching and overlaying the trail as well as the installation of additional drainage pipes and structures. Also included with this project is an alternative option which includes substituting concrete and a wooden boardwalk for a portion of the asphalt trail.
Addenda
(click to expand/collapse)
