TC2025-40 Eastbrook Trail Improvements
1. Project Description This project consists of repairing, patching and overlaying the trail as well as the installation of additional drainage pipes and structures. Also included with this project is an alternative option which includes substituting concrete and a wooden boardwalk for a portion of the asphalt trail.
Bid Documents
(click to expand/collapse)

VIEWING ONLY – NOT FOR DISTRIBUTION
DISTRIBUTION IS AVAILABLE ONLY
FROM THE TOWN OF COLLIERVILLE PROCUREMENT DIVISION
tocpurchasing@colliervilletn.gov
DISTRIBUTION IS AVAILABLE ONLY
FROM THE TOWN OF COLLIERVILLE PROCUREMENT DIVISION
tocpurchasing@colliervilletn.gov
Name | Size | ||
001 COVER | 1.6 MB | ||
002 1 OF 23 | 3.0 MB | ||
003 2 OF 23 | 17.1 MB | ||
004 3 OF 23 | 16.1 MB | ||
005 4 OF 23 | 16.9 MB | ||
006 5 OF 23 | 15.9 MB | ||
007 6 OF 23 | 17.2 MB | ||
008 7 OF 23 | 16.0 MB | ||
009 8 OF 23 | 18.0 MB | ||
010 9 OF 23 | 16.3 MB | ||
011 10 OF 23 | 16.5 MB | ||
012 11 OF 23 | 9.4 MB | ||
013 12 OF 23 | 9.7 MB | ||
014 13 OF 23 | 17.0 MB | ||
015 14 OF 23 | 15.9 MB | ||
016 15 OF 23 | 17.6 MB | ||
017 16 OF 23 | 16.2 MB | ||
018 17 OF 23 | 8.0 MB | ||
019 18 OF 23 | 5.3 MB | ||
020 19 OF 23 | 3.2 MB | ||
021 20 OF 23 | 2.5 MB | ||
022 21 OF 23 | 2.9 MB | ||
023 S101 | 1.8 MB | ||
024 S501 | 1.7 MB |