Harris Elementary School Fire Flow Improvements
Project Description: Replacement of approximately 7,100 linear feet (LF) of existing water mains, including 6-inch cast iron pipe (CIP) and asbestos cement pipe (ACP), with new 12-inch and 16-inch ductile iron pipe (DIP) along Duluth Highway (State Route 120) and Claiborne Drive. The section along Duluth Highway will be 5,800 LF of 12-inch and 16-inch DIP. The section along Claiborne Drive will be 1,300 LF of 12-inch DIP. Includes branch connections and tie-in’s, abandoning existing parallel water mains, service line reconnections, traffic control, erosion control and site clean-up, all other work required to complete the project.
Plan Holders
Date | Company | Contact |
11/10/23 3:03 pm |
Constructconnect
30 Technology Parkway South Suite 100 Norcross, GA 30092 |
Jemar Sagbigsal
Tel: 3236025079
|
11/29/23 1:08 pm |
GS Construction, Inc
526 Lyle Circle Lawrenceville, GA 30046 |
Hilary Croft
Director of Compliance
Tel: 6783778028
Fax: 6783778035
|
11/8/23 3:13 pm |
JDS Inc.
272 Hurricane Shoals Rd. NE Lawrenceville, GA 30046 |
Melissa Montgomery
Project Specialist
Tel: 6782445629
|
11/8/23 9:38 pm |
Professional pipeline llc
2472 Autumn Maple Drive Braselton, GA 30517 |
Chris Opolka
President
Tel: 6788787314
|
12/7/23 2:48 pm |
Site Engineering
7025 Best Friend Road Atlanta, GA 30340 |
Tamara Isbell
Tel: 770-263-7234
|