Harris Elementary School Fire Flow Improvements

Project Description: Replacement of approximately 7,100 linear feet (LF) of existing water mains, including 6-inch cast iron pipe (CIP) and asbestos cement pipe (ACP), with new 12-inch and 16-inch ductile iron pipe (DIP) along Duluth Highway (State Route 120) and Claiborne Drive. The section along Duluth Highway will be 5,800 LF of 12-inch and 16-inch DIP. The section along Claiborne Drive will be 1,300 LF of 12-inch DIP. Includes branch connections and tie-in’s, abandoning existing parallel water mains, service line reconnections, traffic control, erosion control and site clean-up, all other work required to complete the project.
Bid Documents (click to expand/collapse)
Hard copy full sets of plans and specifications will be available for purchase at contractor’s expense, which will be fulfilled by the Barge Design Solutions, Inc.’s Planroom (https://bidding.bargedesign.com/) To purchase a hard copy set or download files, you must register for a free account, if you already have an account, simply log in and select “Download” this entire job. Then proceed to the download queue on the left menu bar to receive your downloaded files. For questions about accessing the documents please contact Memphis Reprographics at 901-381-9811.
Name Size
Volume I - Front End Documents 1.5 MB
Volume II - Technical Specifications 102.8 MB