Walton Blvd. and Central Ave. Intersection Improvements

The project consists of intersection improvements at Walton Boulevard and Central Avenue including dual eastbound and westbound left-turn lanes and northbound and southbound right-turn lanes. The project includes mill and overlay of the existing pavement, full depth pavement widening, and sidewalk relocation or replacement. The project also includes traffic signal reconstruction. The existing storm system within the project limits will be replaced and improved. Specific off-site improvements are also included with the project, for the City of Bentonville Engineering Department.
Bid Documents (click to expand/collapse)
Bidders are solely responsible for obtaining and reviewing all bid documents and ensuring compliance with the instructions and requirements set forth therein. While documents available on this platform are intended to support the bidding process, users should confirm they have obtained all necessary materials relevant to their submission.
Name Size
Specifications 6.3 MB